Our references
At BorsodChem Zrt.:
- Power and instrument installation of polimerizing autoclaves No. VII and VIII, instrumentation of VCM furnaces TDI Plant:
- Power and instrument installation of Waste Water Treatment Plant
- Power and instrument installation of Zone “C”
- Electrical power supply installation and instrumentation of Zone “D” Power and instrumentinstallation of Formaline Plant, electrical installation of Hotel BorsodChem Elecricoverhauling “B” part of worker’s hotel Irinyi, installation of Demag cranes in Mixing Plant Installation of Demag cranesin Granulating Plant, power and instrument implementation jobs of new MDI Plant Powerand instrument implementation jobs of newChlorine Plant Power and instrument recontruction jobs of Waste Water Treatment Plant
At Air Liquide Kft.:
- Instrumentation jobs of Oxygen Plant.
At Asmar Company:
- Instrumentation jobs of boiler house of BC-Power Plant
At Büratech GmbH:
- Power and instrument installation jobs of Demineralized water Plant
At BC-Ongropack Kft.:
- Planning and overhauling jobs of plastic processing line EKK Installation jobs of plastic processing line KM 130/1
At Dynea hungary Kft.:
- Instrumentation jobs of Resin Plant
At Screw and Drawn Steel Section Plant:
- Manufacturing jobs of electrical distributors
At Eurofoam Kft.:
- Planning and implementation jobs of frequency converter of pumps
At Algyő Plant Unit of MOL:
- Maintenance and diagnostic jobs of frequency converter units according to contract At Water Plant of Budapest: Commissioning of 3 pcs. of frequency converter unit each having performance of 250 kW
At Borsod Brewery Rt.:
- Calibration of pressure transmitters, thermometers and thermal transmitters and conductivity meters
At Steel Work of Ózd Kft.:
- Planning and implementation of frequency converter unit (performance of 250 kW) for wire drawing line Re-installation of ”Bohemian” crane capacity of 12 t driving for frequency converter on wire drawing line Installation of freqency converters for lifting dtives of cranes I, II and III capacity of 12.5 tons each in waste deposit area
In Kazincbarcika:
- Heating power plant of town: Implementation of instrumentation
At Budapest Airport Kft.:
- Re-installation and maintenance of frequency converter of ventilator devices at 2/B terminal
At BC-Ongromechanika Kft.:
- Electrical overhauling of 5 t bridge crane for frequency converter operation located in turning hall. Electric overhauling of 10 t bridge crane for frequency converter operation located in mechanical assembly hall.